GE Power India Limited has received orders. Name of the entity awarding the order(s) /contract(s): NTPC Limited, Significant terms and conditions of order(s)/contract(s) awarded in brief: LOI received from NTPC limited for procurement of Spares for Carrying out class-B Inspection of Unit 1 GE make 660 MW GENERATOR at NTPC Solapur, Nature of order(s)/contract(s), Supply of Generator Spares, Time period by which the order(s)/contract(s) is to be executed: Tentatively 40 Weeks, Broad consideration or size of the order(s)/contract(s): Base value as INR 104.7 million plus (GST 18 %); Name of the entity awarding the order(s) /contract(s): Bokaro Power Supply Company (P) Ltd. (BPSCL), Significant terms and conditions of order(s)/contract(s) awarded in brief: Purchase order received for Supply of Spares for TG #8 at BPSCL, Nature of order(s)/contract(s): Supply of Spares, Time period by which the order(s)/contract(s) is to be executed: 12 months, Broad consideration or size of the order(s)/contract(s): Base value as INR 99.1 million plus (GST 18 %). Whether order(s) /contract(s) have been awarded by domestic/international entity: Domestic Entity.