GE Power India Limited has received a purchase order from Lanco Anpara Power Limited. Nature of order: Services for 1st Bottom Bar replacement & Bottom Bars refurbishment of 660 MW DEC make Generator at Anpara. Time period by which the order/contract is to be executed: 35 days.

Broad consideration or size of the order/contract: INR 54.6 million plus (GST 18%).